RealSim City models simulate the world you know and how it could be, from unlimited perspectives. RealSim’s Environment Information Models (EIM’s) combine 3D mapping, architectural and engineering information in to virtual reality simulations of your town, or city. Simulations are equipped with easy to use spatial and lighting analysis tools to allow you quickly and objectively find the answers to environment change questions. They are used by planning authorities, developers, architects and engineers.
ATHENRY
Area: 0.5sqkm
Currency: 2015
Level of detail: LOD2
BELFAST
Area: 1.5sqkm of city centre
Currency: 2013
Level of detail: LOD2 (60% textured)
CLAREMORRIS
Area: 2sqkm
Currency: 2017
Level of detail: LOD2
(5cm ortho photography)
COBH
Area: 2sqkm of city centre
Currency: 2013
Level of detail: LOD2 (30% textured)
DUBLIN CITY
Area: 1.5sqkm of city centre
Currency: From 2008 to 2012
Level of detail: LOD2 (20% textured)
DUNDRUM/SANDYFORD
Area: 9sqkm
Currency: 2006
Level of detail: LOD2 (10% textured)
SWORDS DUBLIN
Area: 10sqkm
Currency: 2008
Level of detail: LOD2
DURROW
Area: 0.5sqkm of city centre
Currency: 2010
Level of detail: LOD2 (100% textured)
GALWAY
Area: 2sqkm
Currency: 2008 - 2014
Level of detail: LOD2 and LOD3 (95% textured)
KILKENNY
Area: 1sqkm
Currency: 2017
Level of detail: LOD3 (5cm ortho photography)
PORTLAOISE
Area: 1sqkm
Currency: 2016
Level of detail: LOD2 and LOD3
(80% textured. 5cm ortho photography)
ST. HELIER
Area: 4sqkm and coverage throughout island
Jersey 3D Model Coverage
Currency: 2012 - 2018
Level of detail: LOD2 - LOD3
WATERFORD
Area: 4sqkm
Currency: 2008
Level of detail: LOD2
WESTPORT
Area: 1sqkm
Currency: 2012
Level of detail: LOD2